NEW QUESTION 24
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 25
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company. It is the end of the year and the labor rates have been recalculated based on new salary dat a. You need to update the effective labor costs for all labor groups.
Which element must be updated?

  • A. cost category
  • B. production orders
  • C. shared category
  • D. cost groups
  • E. resource group

Answer: A

 

NEW QUESTION 26
A company makes engine parts used in the automotive industry.
They are in the process of retooling an existing manufacturing plant. They are looking to use Dynamics 365 for Finance and Operations to help support the Bill of Materials (BOM) product lifecycle for engineering version control.
You must translate existing production processes into the proper elements. You need to create BOM lifecycle states to translate existing production processes into the proper elements.
What type of BOM product lifecycle state should you create? To answer, select the appropriate BOM state in the answer area.

Answer:

Explanation:

Explanation

 

NEW QUESTION 27
A company manufactures high-end speakers. Customers may choose different color finishes and front grills.
You build a product configuration model to represent this speaker.
You add the following attributes for the finish and grill.
You need to create a constraint that defines the allowable finish and grill combinations.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 28
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches.
The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 29
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?

  • A. Set a Constant scrap of five on the BOM line for rubber.
  • B. Set a Variable scrap of five percent for the rubber BOM line.
  • C. Add an additional BOM line for five inches and set consumption to Variable.
  • D. Increase the required quantity of the rubber component by five on the BOM.

Answer: A

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations-w

 

NEW QUESTION 30
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 31
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item as the picking activity.
* Create a service term on the activity to tie the purchase agreement to the activity.
Does the solution meet the goal?

  • A. No
  • B. Yes

Answer: B

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity-based

 

NEW QUESTION 32
A company manufactures high-end speakers. Customers may choose different color finishes and front grills. You build a product configuration model to represent this speaker.
You add the following attributes for the finish and grill.

You need to create a constraint that defines the allowable finish and grill combinations.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 33
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create a regulated products regional list for California, United States. Add item C0001 to the list.
2 - Create an exclusive list type for California, United States.
3 - Open the Regulated products regional lists.
4 - Create an inclusive list type for New York, United States.

 

NEW QUESTION 34
A company plans to implement Dynamics 365 for Finance and Operations.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 35
You manage pricing for a food processing company. The raw materials used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 36
A company implements Dynamics 365 Finance and Operations.
You need to ensure that cost roll-ups and sales price calculations are configured for the scenario. Which options should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

 

NEW QUESTION 37
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 38
A company uses Process manufacturing for most products and Discreet manufacturing for other products. The company is creating a formula for a new product. The new item will be used to make a name brand product and two generic brand products.
This item has the following requirements:
* Production of the name brand and generic products must use the same formula.
* The company must produce all three items at the same time.
You need to create a produced item that can make two generic items and one main item.
How should you set up the item?

  • A. Create the name brand item as a Bills of material production type item.
    Add the two generic items on the Bills of material for the name brand product and use line type phantom.
  • B. Create the name brand item as a Bills of material production type item.
    Create the two generic items as a sub-assembly on the Bills of material for the name brand product.
  • C. Create the name brand product as the main product and use a formula production type. Create the two generic items as a formula planning production type planning items. Copy the formula from the name brand item into each of the generic items.
  • D. Create the name brand product as the main product and use a formula production type.
    Create the two generic products as co-products as part of the formula for the name brand product.

Answer: A

 

NEW QUESTION 39
A company implements Dynamics 365 for Finance and Operations.
Production orders are generated for products directly from projects. You create the following production order:

Use the drop-down menus to select the answer choice that answers each question based on the information presented in the graphic. NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 40
A company uses warehouse management and manufacturing execution to process their production orders.
You configure the manufacturing execution production order defaults to always consume Bill of materials (BOM) components when an operation step is completed in the job registration terminal. You create a production order. The order is in released status.
You need to process this order all the way through to end status.
Which four actions should you perform in sequence? To answer, check the appropriate actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 41
A configure-to-order company is implementing Dynamics 365 for Finance and Operations. The company is preparing to use the product configuration model functionality to develop the Bill of materials (BOM), routes and valid configuration combinations.
You need to set up the configuration models, constraints, and pricing.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

 

NEW QUESTION 42
You are developing a new car audio system kit. The kit configuration has restrictions based on car model, speaker size, and other expression constraints.
You need to set up a new item for the car audio system.
How should you create the new product? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 43
You are a functional consultant for Contoso Entertainment System USA.
You need to configure the system to ensure that the production release to warehouse process either performed manually or via batch.
To complete this task, sign in to Dynamics 365 portal.

Answer:

Explanation:
See explanation below.
* Navigate to Production control > Setup > Production parameters.
* Configure the Production line release parameter to Release BOM and formula lines via a batch job or as a manual interaction.
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/releasing-bom-and-formula-line

 

NEW QUESTION 44
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

 

NEW QUESTION 45
A company implements Dynamic 365 for Finance and Operations. You run the latest master plan. You observe invalid results.
You need to set up tracing for the master plan.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 46
A Discrete manufacturing company produces speakers. The high-end speaker model uses protective rubber strips on the edges.
Approximately five inches of rubber is consistently scrapped in the production process, regardless of production quantity. Workers manually consume the extra material on the picking list or scrap it in an inventory journal.
You need configure the system to automatically account for this scrap on the Bill of materials (BOM).
What should you do?

  • A. Set a Constant scrap of five on the BOM line for rubber
  • B. Set a variable scrap of five percent for the rubber BOM line
  • C. Increase the required quantity of the rubber component by five on the BOM
  • D. Add an additional BOM line for five inches and set consumption to Variable

Answer: A

Explanation:
Explanation/Reference:
References:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-information-used-in-bom-calculations- with-standard-costs

 

NEW QUESTION 47
You are the lead product design manager at a Process manufacturing plant.
You are building a formula that produces egg yolks as a by-product. This by-product is added back into inventory at standard cost and can be used in other production batches.
You need to select the by-product cost allocation.
Which cost allocation type should you use?

  • A. Per quantity
  • B. Recycled
  • C. Percent
  • D. Per series

Answer: A

 

NEW QUESTION 48
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

 

NEW QUESTION 49
......

Certification Training for MB-320 Exam Dumps Test Engine: https://www.exam4labs.com/MB-320-practice-torrent.html

Microsoft Dynamics 365 MB-320 Real Exam Questions and Answers FREE Updated: https://drive.google.com/open?id=1TLm-8WeFvtbT1NO7zdCteaMNBh6tVe50