Full MB-320 Practice Test and 145 unique questions with explanations waiting just for you!
Microsoft Dynamics 365 Dumps MB-320 Exam for Full Questions - Exam Study Guide
NEW QUESTION 41
You are the product manager at an orange juice manufacturing company.
For every 1,000 pounds of orange juice, 20 pounds of orange pulp is created which can be sold or reused profitably. The cost is calculated as a weighted average between the quantity of orange juice that is reported as finished and the orange pulp based on the standard cost of each item.
You need to create the formula for orange juice that will produce orange pulp as a result of finishing a batch order.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 42
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
Several components used in the production of the pain-relieving lotion and oils have special government-mandated reporting requirements.
You need to ensure the company can provide the appropriate reporting and tracking for these components.
Which parameters should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 43
A company produces homeopathic lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have replaced the vendor of a product's active ingredient with a new vendor. The new vendor is supplying the ingredient at a higher concentration of 25 percent.
The previous vendor concentration was 15 percent. You are consistently running out of two of the complimentary ingredients.
You need to update the formula and ingredient settings to allow for better order planning.
What should you do?
- A. Modify the minimum and maximum value of the attribute for the active ingredient
- B. Modify the factor value of the compensation principle
- C. Modify the target value of the attribute for the compensating ingredients
- D. Modify the target value of the attribute for the active ingredient
Answer: B
NEW QUESTION 44
A company uses Lean manufacturing concepts to produce paper plates redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
NEW QUESTION 45
A company produces custom-made bicycles that offer many different configurations.
Your standard bicycle, B-0001, is made with many common components such as a frame and wheels.
Customers can choose between two frames: F-0001 or F-0009. Wheel W-0001 is only compatible with frame F-0001.
You create the following configuration groups: Frames, Wheels
You need to ensure that users can only select valid combinations of frames and wheels.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
NEW QUESTION 46
You are responsible for product and formula maintenance for a paint manufacturer.
You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately.
You need to set up the formula line for the pigment.
Which formula feature should you use?
- A. Pegged supply
- B. Step consumption
- C. Variable
- D. Scalable
Answer: D
Explanation:
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/formulas-versions#use-the-scalable-feature
NEW QUESTION 47
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
1 - Create a regulated products regional list for California, United States. Add item C0001 to the list.
2 - Create an exclusive list type for California, United States.
3 - Open the Regulated products regional lists.
4 - Create an inclusive list type for New York, United States.
NEW QUESTION 48
You need to create the constraint for the ML seat selection.
Which expression constraint should you use?
- A. Implies[Seat==ML,Trim==Legend]
- B. Seat!=ML
- C. [Trim==Legend|Seat==ML]
- D. Implies[Trim==Legend,Seat==ML]
Answer: A
Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/expression-constraints-table-constraints- product-configuration-models
NEW QUESTION 49
You need to set up the configuration model to price the motorcycles correctly. What should you do?
- A. Set Order type in price model to Sales Order and Pricing method in Version to Cost based.
- B. Set Order type in price model to Sales Order and Pricing method in Version to Attribute based
- C. Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.
- D. Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based
Answer: D
NEW QUESTION 50
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company implements Dynamics 365 for Finance and Operations for their Lean manufacturing environment.
There has been an engineering change to a fixed quantity product that is in production. This change will add an additional processing step as the second step. The existing version must be phased out and replaced by the new version.
You need to ensure that the engineering change takes affect at the end of the month.
Solution:
* Edit the existing production flow and set the expiration date to the end of the month.
* Using the existing production flow, create a production flow and version. Set the expiration date to the end of the month. Create an activity for the new process step and add it in the proper sequence.
* Create a Kanban rule that uses the last day of the month as the effective date.
* Edit the existing Kanban rule. Set the expiration date to the end of the month. Set the new Kanban rule as the replacement Kanban rule.
* Activate the new production flow.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: B
NEW QUESTION 51
A company uses a make-to-stock strategy for their key production components.
The number of active Kanbans for these components must be constant.
You need to configure a new Kanban rule.
How should you set up the Kanban type and replenishment strategy? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 52
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company. It is the end of the year and the labor rates have been recalculated based on new salary data. You need to update the effective labor costs for all labor groups.
Which element must be updated?
- A. cost category
- B. shared category
- C. cost groups
- D. production orders
- E. resource group
Answer: D
NEW QUESTION 53
Note: This question is part of series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company produces and distributes seafood to supermarkets. During the manufacturing process, raw seafood is purchased, cleaned, and packaged into various-sized boxes. Each box may have a different weight.
Product is sold by the box and priced by the pound.
You need to ensure that you can perform transactions at the box level and record the net weight of goods shipped to a customer.
Solution: Set up the product with a sales unit measure of pounds and inventory unit measure of box. Set a standard unit conversation for the product from box to pounds.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: A
Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-catch-weight-items
NEW QUESTION 54
You are the production supervisor at a manufacturing company. You are in the process of configuring the production control module and its parameters.
A company plans to use manufacturing execution. Bill of materials (BOM) item consumption must be generated when items are reported at the operation level.
You need to configure the Manufacturing execution production order defaults form to allow for back flushing on operations.
How should you set up Automatic BOM consumption? To answer, drag the appropriate setting to the correct targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/production-pa
NEW QUESTION 55
A company produces lotions for pain relief and uses Dynamics 365 for Finance and Operations.
You have been provided the following information for a new relieving lotion.
Use the drop-down menus to select the answer choice that completes each statement based on the information presented in the graphic.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 56
You are the production supervisor at a chemical processing plant. You must track attributes for each batch of chemicals. Automated quality orders must be generated when a batch order for these chemicals is reported as finished.
You need to ensure that the values of attributes are updated and tracked.
What three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.
- A. Set up batch attributes
- B. Assign the attributes to the chemicals
- C. Assign the attributes to the appropriate test on the test group
- D. Create a test instrument for each attribute
- E. Create attribute types
Answer: A,B,D
NEW QUESTION 57
A company plans to implement Dynamics 365 for Finance and Operations.
You need to determine which manufacturing solutions to use.
Which manufacturing solution should you use? To answer, drag the appropriate setting to the correct drop targets. Each source may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
NEW QUESTION 58
A company manufactures high-end speakers. Customers may choose different color finishes and front grills.
You build a product configuration model to represent this speaker.
You add the following attributes for the finish and grill.
You need to create a constraint that defines the allowable finish and grill combinations.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 59
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a vendor resource and work cell for outsourced painting; add the vendor resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item for picking.
* When the service is required, create a purchase order to the subcontracting vendor and add a line for the service item and the vendor price.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: B
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity-based
NEW QUESTION 60
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some questions sets might have more than one correct solutions, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean process. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
1.) Create a purchase agreement for the subcontracting vendor and add SP-01 as the painting service
2.) Create a vendor resource then create a work cell for outsourced painting and add the resource to the work cell
3.) Create a production flow process activity for the painting work cell and add the component to be painted as a picking activity
4.) Create a service term to tie the purchase agreement to the activity Does this solution meet the goal?
- A. No
- B. Yes
Answer: A
NEW QUESTION 61
A company implements Dynamics 365 for Finance and Operations. You must use functionality in the system for group production runs to prevent downtime and excessive cleaning of the machines on the production line.
You need to set up the system.
Which behaviors should you expect? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:

NEW QUESTION 62
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A manufacturing plant uses Lean processes. You plan to outsource a painting operation to a subcontracting vendor. You create a service item named SP-01 to represent the painting service.
You need to create a subcontracting activity for the painting service.
Solution:
* Create a purchase agreement for the subcontracting vendor that contains the pricing information for SP-01.
* Create a vendor resource and a work cell for outsourced painting, then add the resource to the work cell.
* Create a production flow process activity using the painting work cell and the service item as the picking activity.
* Create a service term on the activity to tie the purchase agreement to the activity.
Does the solution meet the goal?
- A. No
- B. Yes
Answer: B
Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/activity-based
NEW QUESTION 63
A company wants to account for the time to set up a machine to manufacture a new part.
You need to set up the costing calculations in the system.
Which three calculation group warnings can you set up? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.
- A. No cost price
- B. No consumption
- C. No route
- D. No BOM
- E. No resources
Answer: A,C,D
Explanation:
Explanation/Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/cost-management/bom-calculation-groups
NEW QUESTION 64
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.
Answer:
Explanation:
Explanation
NEW QUESTION 65
You are the product manager at a paint manufacturing company. Paint base is produced in 100 gallon batches.
The paint base can be packaged in 1 gallon, 5 gallon, and 10 gallon containers.
You want to use consolidated batch orders for the bulk paint base item. You need to set up the items and formulas to allow for consolidated batch orders.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
Answer:
Explanation:
Explanation
NEW QUESTION 66
......
Authentic Best resources for MB-320 Online Practice Exam: https://www.exam4labs.com/MB-320-practice-torrent.html
Get the superior quality MB-320 Dumps Questions from Exam4Labs: https://drive.google.com/open?id=1zX5r7SB4lqmdff2I8D8uI6TU0Zurb7tJ