NEW QUESTION # 20
Which is a benefit of earning Regional Priority credits?

  • A. The context of the project's location is not addressed, allowing the project team to focus on the building's priority issues
  • B. The LEED project is able to skip a review phase by considering the issues that are a priority in the project's location
  • C. The LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location
  • D. The project's operations are considered separately from design and construction, allowing the project team to focus on regional issues

Answer: C

Explanation:
Explanation
A benefit of earning Regional Priority credits is that the LEED project can achieve more sustainable outcomes by recognizing the issues that are a priority in the project's location. Regional Priority credits are not new LEED credits, but instead are existing credits that USGBC regional councils and chapters have designated as being particularly important for their areas1. The incentive to achieve the credits is in the form of a bonus point. If an RP base credit is earned, then a bonus point is awarded to the project's total points1. This way, the project can address the geographically specific environmental, social equity and public health priorities of its location2. References:
Regional priority credit lookup | U.S. Green Building Council
Regional Priority (RP) credits - U.S. Green Building Council


NEW QUESTION # 21
A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

  • A. Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction
  • B. Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction
  • C. Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction
  • D. Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

Answer: A

Explanation:
Explanation
A rainwater harvesting system on site could be recognized in the Sustainable Sites Credit, Rainwater Management and the Water Efficiency Credit, Indoor Water Use Reduction. The Sustainable Sites Credit, Rainwater Management rewards projects that reduce runoff volume and improve water quality by replicating the natural hydrology and water balance of the site1. A rainwater harvesting system can help achieve this by capturing and reusing rainwater on site2. The Water Efficiency Credit, Indoor Water Use Reduction rewards projects that reduce indoor water consumption by installing water-efficient fixtures and fittings3. A rainwater harvesting system can help achieve this by providing an alternative source of water for non-potable uses such as toilet flushing and irrigation4.
The other options are not correct. The Water Efficiency Credit, Water Metering does not recognize rainwater harvesting systems, but rather requires projects to install permanent water meters that measure the total potable water use for the building and grounds. The Water Efficiency Prerequisite, Outdoor Water Use Reduction does not recognize rainwater harvesting systems, but rather requires projects to reduce outdoor water consumption by using plant species that are native or adapted to the region and by using irrigation systems that are efficient and properly controlled. The Water Efficiency Prerequisite, Indoor Water Use Reduction does not recognize rainwater harvesting systems, but rather requires projects to reduce indoor water consumption by 20% from the baseline by installing water-efficient fixtures and fittings.
References:
*Rainwater Management, p. 1
*NC-v4 SSc4: Rainwater management, p. 2
*Indoor water use reduction, p. 1
*NC-v4 WEc3: Indoor water use reduction, p. 3
*[Water metering], p. 1
*[Outdoor water use reduction], p. 1
*[Indoor water use reduction], p. 2


NEW QUESTION # 22
Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

  • A. Electronic submeter at the domestic water supply pipe to the building
  • B. An open-loop HVAC system that discharges potable cooling water to a nearby lake
  • C. A standard garbage disposal
  • D. Commercial dishwasher that is ENERGY STAR labeled or performance equivalent

Answer: D

Explanation:
Explanation
The Water Efficiency Credit, Indoor Water Use Reduction aims to reduce indoor water consumption by installing water-efficient fixtures and fittings, such as faucets, showerheads, toilets, and urinals1. A commercial dishwasher that is ENERGY STAR labeled or performance equivalent would help reduce the water use for dishwashing, which is one of the process water uses included in the credit calculation2. A standard garbage disposal would not reduce water use, but rather increase it. An electronic submeter at the domestic water supply pipe to the building would help measure and monitor water use, but not directly reduce it. An open-loop HVAC system that discharges potable cooling water to a nearby lake would waste a lot of water and potentially harm the environment.
References:
* Indoor Water Use Reduction
* "Maximizing Water Efficiency in Commercial Buildings: Understanding LEED BD+C Water Efficiency Credits"


NEW QUESTION # 23
Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?

  • A. Contractor
  • B. Owner
  • C. Facility manager
  • D. Occupants

Answer: A

Explanation:
Explanation
Contractor
The contractor is the project team member who should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning.
The contractor is responsible for implementing the waste management plan, which includes estimating the types and quantities of waste materials, identifying the diversion strategies, selecting the waste haulers and recyclers, tracking and documenting the waste diversion performance, and training the subcontractors and workers. The contractor can provide valuable input on how to reduce, reuse, and recycle the construction and demolition waste, as well as identify potential challenges and opportunities for achieving the prerequisite requirements.
References:
Reference Guide for Building Design and Construction v4 - Pages 263-2641 LEED Certification and Sustainable Construction Waste Management1


NEW QUESTION # 24
Location and Transportation Credit, Reduced Parking Footprint calculations must include

  • A. parking within 1/4 mi. (0.40 km) radius of the project boundary
  • B. on-street parking in public rights-of-way
  • C. motorbike spaces
  • D. parking outside the project boundary but used by the project

Answer: D

Explanation:
Explanation
This option requires the project to include all parking spaces that are outside the project boundary but are used by the project occupants, visitors, or customers in the calculations for the reduced parking footprint credit1.
This option ensures that the project accounts for the total parking demand and supply associated with the project, regardless of the location of the parking spaces2.
References: = [LEED v4: Building Design + Construction Guide], NC-v4 LTc7: Reduced parking footprint | LEEDuser.


NEW QUESTION # 25
Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

  • A. Providing an educational program on the environmental and human health benefits of green building practices
  • B. Including locked, indoor bicycle storage for 100% of project occupants
  • C. Being located next to a 20 mi. (32 km) award-winning bicycle trail
  • D. Distributing leaflets to project occupants about available public transit services nearby

Answer: A

Explanation:
Explanation
Providing an educational program on the environmental and human health benefits of green building practices is a potential innovation strategy that is not addressed by any existing LEED credit. It also meets the criteria of being measurable, replicable, and having a positive impact on the project and the environment.References:
LEED v4 BD+C Reference Guide, Innovation Category, INc1: Innovation, Option 1. Innovation (1 point), page 704.


NEW QUESTION # 26
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
Whole-Building Life-Cycle Assessment is a

  • A. cradle-to-grave assessment
  • B. cradle-to-cradle assessment
  • C. gate-to-gate assessment
  • D. cradle-to-gate assessment

Answer: A

Explanation:
Explanation
The scope of analysis in Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4.
Whole-Building Life-Cycle Assessment is a cradle-to-grave assessment.This means that the life cycle assessment (LCA) covers all stages of the building's life cycle, from the extraction of raw materials (cradle) to the disposal or reuse of the building components at the end of their service life (grave)1.The LCA must include the following life cycle stages: product stage, construction process stage, use stage, and end-of-life stage2.The LCA must also account for the environmental impacts of the building's structure and enclosure, as well as any other building elements that are permanently attached to and share service systems with the building2.
References:
* Whole building life cycle assessment through LEED v4
* Building life-cycle impact reduction | U.S. Green Building Council


NEW QUESTION # 27
Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

  • A. Water treatment calculations and system performance narrative
  • B. Non potable water sources and bacteria testing
  • C. Makeup water meters, conductivity controllers and overflow alarms
  • D. Alkalinity testing and ENERGY STAR rating

Answer: C

Explanation:
Explanation
Makeup water meters, conductivity controllers and overflow alarms
According to the Water Efficiency Prerequisite for Indoor Water Use Reduction, cooling towers and evaporative condensers must be equipped with makeup water meters, conductivity controllers and overflow alarms to reduce water consumption and prevent water waste. These devices help monitor and control the water quality, flow rate and level of the cooling system, and alert the operators of any malfunctions or leaks.
References: As per the LEED AP Building Design + Construction (LEED AP BD+C) V4 resources, the installation of makeup water meters, conductivity controllers and overflow alarms is a requirement for cooling towers and evaporative condensers under the Water Efficiency Prerequisite for Indoor Water Use Reduction.
This prerequisite aims to reduce indoor water consumption by setting baseline and efficiency standards for fixtures, fittings, appliances, equipment and processes. For cooling towers and evaporative condensers, the prerequisite also requires efficient drift eliminators that reduce drift to a maximum of 0.002% of recirculated water volume for counterflow towers and 0.005% of recirculated water flow for cross-flow towers. For more detailed information, you can refer to the web-based reference guide in the credit library atUSGBC's official website.


NEW QUESTION # 28
Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

  • A. University campus land areas within 1/2 mi. (0.80 km) of the project boundary
  • B. Surface parking areas within 1/2 mi. (0.80 km) of the project boundary
  • C. Buildable land within 1/4 mi. (0.40 km) of the project boundary
  • D. Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

Answer: D

Explanation:
Explanation
This option requires the project team to exclude public right-of-way areas, such as streets, sidewalks, and alleys, from the calculations of the surrounding existing density1. This option ensures that the density is measured based on the buildable land area, which is the area available for development or construction2.
References: = [LEED v4: Building Design + Construction Guide], Surrounding density and diverse uses.


NEW QUESTION # 29
When considering the Indoor Environmental Quality Credit, Thermal Comfort, what is the minimum percentage of building occupants that must have individual comfort controls?

  • A. 75%
  • B. 25%
  • C. 10%
  • D. 50%

Answer: D

Explanation:
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, the Thermal Comfort credit requires providing individual comfort controls for at least 50% of individual occupant spaces, and group controls for 100% of shared multioccupant spaces1. Individual comfort controls allow occupants to adjust one or more of the following: air temperature, air speed, radiant temperature, or humidity. Group controls are shared by two or more occupants within a thermal zone. The credit aims to promote occupants' productivity, comfort, and well-being by providing quality thermal comfort. References: EQ Credit Thermal Comfort, LEED v4 Reference Guide for Building Design and Construction123


NEW QUESTION # 30
What is the minimum number of members of the integrated project team for the Integrative Process Prerequisite, Integrative Project Planning and Design?

  • A. Four
  • B. One
  • C. Six
  • D. Two

Answer: C


NEW QUESTION # 31
A project is designed to remodel an existing warehouse into multi-family housing. The exterior facade of the warehouse will remain, but 40% of the interior will be demolished and replaced for interior new construction.
New materials will be used for the new construction. To achieve points in the Materials and Resources Credit, Building Life-Cycle Impact Reduction, which credit path option would apply?

  • A. Renovation of Abandoned or Blighted Building
  • B. Building and Material Reuse
  • C. Whole-Building Life-Cycle Assessment
  • D. Historic Building Reuse

Answer: A

Explanation:
Explanation
This option applies to projects that renovate an existing building that meets the definition of abandoned or blighted, and use new materials for at least 50% of the surface area. The project meets these criteria, as the warehouse is an existing building that is presumably abandoned or blighted, and the new construction will use new materials for 40% of the interior and some of the exterior. References: LEED v4: Building Design + Construction Guide, Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 4:
Renovation of Abandoned or Blighted Building
------


NEW QUESTION # 32
What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

  • A. Vicinity map showing bicycle network, route and distance along network to eligible destination(s)
  • B. Photographs of bicycle network signage and directional signposts
  • C. Photographs of the installed bicycle storage and shower facilities
  • D. Manufacturer specifications for the chosen bicycle storage facilities, including the number of bicycles supported by each bike rack

Answer: A

Explanation:
Explanation
The Location and Transportation Credit, Bicycle Facilities, requires the project team to provide a vicinity map that shows the bicycle network, the route and the distance along the network to eligible destination(s) for all LEED Building Design and Construction projects. The vicinity map is a supporting material that demonstrates that the project site is within a 200-yard (180-meter) walking distance of a bicycle network that connects to at least one of the following: diverse uses, public transportation, recreation facilities, or schools1. The vicinity map must also show the scale and the north arrow, and indicate the project site and the eligible destination(s)2.
The photographs of bicycle network signage and directional signposts, the photographs of the installed bicycle storage and shower facilities, and the manufacturer specifications for the chosen bicycle storage facilities are not required for the bicycle network, but for the bicycle storage and shower facilities.
References:
*LEED v4 Reference Guide for Building Design and Construction, Location and Transportation Credit:
Bicycle Facilities, page 1281
*LEED v4.1 Bicycle Storage Requirements


NEW QUESTION # 33
Which of the following is required when documenting a LEED Pilot credit?

  • A. Innovation narrative
  • B. Pilot Credit registration
  • C. Compliance letter
  • D. LEED AP approval

Answer: B

Explanation:
Explanation
Pilot Credit registration is required when documenting a LEED Pilot credit. This is to ensure that the project team has access to the latest pilot credit language and requirements, and that USGBC can track the usage and feedback of the pilot credits. The other options are not required for documenting a pilot credit, although they may be helpful or applicable for other credits.References: LEED Pilot Credit Library, Getting Started, page 1.


NEW QUESTION # 34
A new five-story building with a 30,000 ft2 (2 800 m2) footprint is being designed on a previously disturbed100,000 ft2 (9 290 m2) site. The remaining on-grade surface will be 35,000 ft2 (3 250 m2) of asphalt parking, and 35,000 ft2 (3 250 m2) of native vegetated open space. To achieve a point for exemplary performance under Option 1 of Sustainable Sites Credit, Site Development - Protect or Restore Habitat, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of

  • A. 12,500 ft2 (1 160 m2)
  • B. 35,000 ft2 (3 250 m2)
  • C. 25,000 ft2 (2 300 m2)
  • D. 15,000 ft2 (1 400 m2)

Answer: C

Explanation:
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, Option 1 of the Site Development - Protect or Restore Habitat credit requires restoring 25% of the site area (including the building footprint) with native or adapted vegetation1. To achieve exemplary performance, the project must double the credit requirements and restore 50% of the site area2. In this case, the site area is 100,000 ft2 (9 290 m2), so the project must restore 50,000 ft2 (4 645 m2) with vegetation. The project already has 35,000 ft2 (3 250 m2) of native vegetated open space, so it needs to add another 15,000 ft2 (1 395 m2) of vegetation. Since the on-grade surface is fully occupied by the building footprint and the asphalt parking, the only option is to incorporate a vegetated roof. Therefore, the design team will have to incorporate a native and/or adapted vegetated roof with a minimum area of 15,000 ft2 (1 395 m2). References: SS Credit Site Development - Protect or Restore Habitat, LEED v4 Reference Guide for Building Design and Construction13


NEW QUESTION # 35
Which of the following are control measures recommended by the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) for the Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan?

  • A. Pre-construction meeting
  • B. Source control
  • C. Material selection
  • D. Contractor training

Answer: B

Explanation:
Explanation
Source control is one of the control measures recommended by the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) for the Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan. Source control means minimizing the generation and emission of indoor air pollutants from the construction activities and materials. Some examples of source control are1:
*Using low-emitting adhesives, sealants, paints, coatings, and flooring systems that comply with the VOC limits of the applicable LEED credit.
*Storing absorptive materials in a protected area and covering them with plastic sheeting to prevent moisture and mold growth.
*Scheduling the installation of finish materials after the completion of wet and dusty work, such as concrete pouring, drywall sanding, and painting.
*Isolating work areas where high levels of contaminants are generated or used, such as welding, cutting, grinding, and solvent cleaning, and providing adequate ventilation and exhaust.
*Prohibiting smoking, eating, and drinking in the work areas, and providing designated areas for these activities.
References:
*Construction indoor air quality management plan | U.S. Green Building Council1


NEW QUESTION # 36
What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

  • A. Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided
  • B. Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided
  • C. Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided
  • D. Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Answer: A

Explanation:
Explanation
Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided.This is the requirement for Retail projects under the Materials and Resources Prerequisite, Storage and Collection of Recyclables, according to the LEED v4 BD+C Reference Guide1.The purpose of this prerequisite is to facilitate the reduction of waste generated by building occupants that is hauled to and disposed of in landfills1.The prerequisite applies to all LEED BD+C projects, but Retail projects have a different approach than other project types because of their unique waste streams and operational characteristics1. Retail projects must conducta waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments.The audit or projection must identify the top-five recyclable waste streams by weight or volume using consistent metrics throughout1.The waste stream study period must be a minimum of 24 hours1.Retail projects must also provide dedicated areas that serve the entire building and are accessible to waste haulers and building occupants for the collection and storage of materialsfor recycling for at least four of the top-five recyclable waste streams identified by the audit or projection1.References:
* Prerequisite: Storage and collection of recyclables | U.S. Green Building Council


NEW QUESTION # 37
Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

  • A. ASHRAE 90.1-2010
  • B. ASHRAE 62.1-2010
  • C. ASHRAE 55-2010
  • D. ASHRAE 189.1-2010

Answer: C

Explanation:
Explanation
To comply with Indoor Environmental Quality Credit, Thermal Comfort, the standard that needs to be followed is ASHRAE 55-2010, Thermal Environmental Conditions for Human Occupancy, with errata or a local equivalent1. This standard specifies the combinations of indoor thermal environmental factors and personal factors that will produce thermal environmental conditions acceptable to a majority of the occupants within the space2. The standard also provides methods for measuring and evaluating thermal comfort, as well as guidance for design, operation, and maintenance of thermal comfort systems2. References: Thermal comfort; ASHRAE 55-2010


NEW QUESTION # 38
Which of the following will contribute to reducing the heat island effect?

  • A. Steep sloped roof with initial SRI of 35
  • B. Artificial turf grass
  • C. Intensive vegetated roof
  • D. Low sloped roof with initial Solar Reflectance Index (SRI) of 64

Answer: C

Explanation:
Explanation
An intensive vegetated roof is a roof that has a thick layer of soil and plants that provide shade, evapotranspiration, and stormwater management. It can reduce the heat island effect by lowering the surface and air temperature of the roof and the surrounding area. Artificial turf grass does not reduce the heat island effect because it is not a living plant and does not provide cooling benefits. A steep sloped roof with initial SRI of 35 does not meet the minimum requirement of 39 for Option 1 or 32 for Option 2 of the Heat Island Reduction credit. A low sloped roof with initial SRI of 64 exceeds the minimum requirement of 82 for Option
1 or 64 for Option 2, but it is not the best option among the choices because it only reflects solar radiation and does not provide other benefits such as shading, evapotranspiration, and stormwater management. References:
Heat Island Reduction credit in LEED BD+C: New Construction v4.1 - LEED v4.11 SpecTopics: Heat Island Reduction Credit and LEED® V4/V4.12 LEED Principle: Urban Heat Island Mitigation and Roofing3


NEW QUESTION # 39
......

Accurate & Verified 2024 New LEED-AP-BD-C Answers As Experienced in the Actual Test!: https://www.exam4labs.com/LEED-AP-BD-C-practice-torrent.html