NEW QUESTION # 11
Your team's Product Owner approaches you for a word in private. She expresses some concerns she has about the team'scommitment and productivity. She has noticed that comparable teams within the development organization have a higheraverage velocity. How would you handle this situation?
Answer:
Explanation:
When a Product Owner raises concerns about the team's commitment and productivity based on comparisons ofvelocitywith other teams, this signals a need for coaching onempiricism, transparency, and appropriate use of Scrum metrics. As a Scrum Master, my response would focus on reframing the discussion fromoutput comparisontovalue delivery and continuous improvement.
First, I would explain thatvelocity is a team-specific, contextual measure. Velocity reflects how much work a specific team completes within a given context, using its own Definition of Done, skills, tooling, and domain complexity. The Scrum Guide does not define velocity as a performance or comparison metric.
Comparing velocity across teams is misleading and risks encouraging dysfunctional behavior, such as inflating estimates, cutting quality, or gaming the system. Therefore, a higher velocity does not automatically indicate higher productivity, commitment, or value delivery.
Second, I would explore the Product Owner's underlying concern rather than focusing on velocity itself.
Often, concerns about velocity are proxies for deeper issues such as:
* Missed Sprint Goals,
* Unmet stakeholder expectations,
* Slow value delivery,
* Quality problems or unpredictability.
As a Scrum Master, I would help the Product Owner articulatewhat outcome they are truly worried about, and then guide the discussion toward metrics and observations that better reflect those concerns, such as progress toward Product Goals, customer feedback, Increment quality, or predictability over time.
Third, I would reinforce the importance ofempiricism and transparency. If there are genuine concerns about commitment or effectiveness, these should be inspected using transparent evidence within the team's own context. The Sprint Review and Sprint Retrospective provide structured opportunities to inspect outcomes and ways of working. Rather than privately judging the team based on external comparisons, these concerns should be addressed openly and constructively with the Scrum Team.
Fourth, I would coach the Product Owner onScrum Values, particularlyRespect and Openness. Assuming lower commitment based on velocity comparisons risks undermining trust and psychological safety. Scrum encourages respecting the team as capable professionals and being open to learning what is actually limiting their effectiveness. Blame-oriented comparisons reduce the likelihood of honest inspection and improvement.
Finally, if improvement is needed, the Scrum Master should support the Scrum Team inidentifying and addressing impediments. This may involve examining workload, technical debt, unclear backlog items, excessive dependencies, or organizational constraints. The focus should be on enabling the team to improve sustainably, not on pushing them to match another team's numbers.
NEW QUESTION # 12
You are a Scrum Master working with a Scrum Team. The Development Team constantly complain that requirements are not clear enough. The Product Owner claims she is too busy to provide extra clarity. What should you do?
Answer:
Explanation:
This situation represents a breakdown inProduct Backlog transparency and collaboration, which directly threatens empiricism and value delivery. As a Scrum Master, my responsibility is not to solve the problem myself, but toenable the Scrum Team and the organization to resolve it.
1. Reframe the Problem: Requirements vs. Product Backlog
First, I would help both parties reframe the issue. In Scrum, we do not work with "requirements" in a traditional, fixed sense. Instead, we work with aProduct Backlog that is emergent, ordered, and continuously refined. Lack of clarity in Product Backlog Items means that the backlog is not in a usable state, which is an impediment to the Developers.
2. Make the Impact Transparent
Next, I would facilitate a conversation to make the impact of unclear backlog itemstransparent:
* Developers cannot reliably forecast work,
* Sprint Goals are put at risk,
* Rework and waste increase,
* Delivery of value slows down.
This conversation should involve the Product Owner and be grounded inevidence, not blame. The goal is shared understanding of the consequences, not assigning fault.
3. Reinforce Product Owner Accountability
The Scrum Guide is clear that theProduct Owner is accountable for maximizing value and for Product Backlog management, which includes ensuring that Product Backlog Items are clear, understood, and ordered. Being "too busy" does not remove this accountability. As a Scrum Master, I wouldcoach the Product Ownerto recognize that insufficient availability is itself an organizational impediment.
4. Enable Collaboration, Not Handoffs
At the same time, I would coach the Developers that clarity is oftenco-created, not simply provided. Scrum encourages close collaboration between Developers and the Product Owner. Techniques such as:
* Regular Product Backlog refinement,
* Joint discussions during Sprint Planning,
* Asking focused questions around the Sprint Goal,can significantly improve shared understanding without relying on detailed upfront specifications.
5. Address Organizational Constraints
If the Product Owner's lack of availability is due to organizational overload or competing responsibilities, this becomes asystemic impediment. In that case, the Scrum Master must raise this issue to the organization and help leadership understand that a Product Owner who is not sufficiently available puts product outcomes at risk.
NEW QUESTION # 13
During a retrospective, one of the more junior developers confesses he has a hard time getting his opinion heard. Whendiscussing the work to be done, the more experienced developers often don't let him finish his sentences or disregard what hehas to say. What Scrum Values are touched upon here?
Answer:
Explanation:
The situation described directly touches on several coreScrum Values, which guide behavior and collaboration within Scrum Teams. In particular, the values ofCourage, Respect, and Opennessare most prominently involved.
First, the value ofCourageis demonstrated by the junior developer. Speaking up about feeling unheard, especially in front of more experienced colleagues, requires personal courage. Scrum encourages team members to be brave in raising difficult or uncomfortable issues so that problems can be addressed rather than ignored. Without courage, important impediments to collaboration and effectiveness would remain hidden.
Second, the situation highlights a lack ofRespectin team interactions. Scrum emphasizes that Scrum Team members respect each other as capable, independent individuals. Interrupting a colleague or disregarding their input-regardless of seniority-undermines this value. Respect is essential for effective collaboration and for creating an environment where all team members can contribute fully.
Third, the value ofOpennessis central to this scenario. Scrum Teams are expected to be open about challenges, feedback, and differing perspectives. Openness also means being receptive to ideas from all team members, independent of role, experience level, or background. Disregarding input from a junior developer contradicts Scrum's emphasis on openness and reduces the quality of decision-making.
NEW QUESTION # 14
When working on one software product with multiple Scrum teams in Scrum Nexus, what is important about dependenciesof the planned Backlog Items and integration of the work being done?
Answer:
Explanation:
When multiple Scrum Teams work together on a single product usingScrum Nexus, managing dependencies and ensuring effective integration are critical to delivering a usable Increment each Sprint. Scrum Nexus extends Scrum by explicitly addressing the complexity that arises from multiple teams working on the same product.
First,dependencies between teams should be minimized. Dependencies reduce autonomy, slow feedback, and increase risk. In Nexus, Product Backlog Items should be ordered and refined in such a way that work with strong dependencies is keptwithin a single team whenever possible. This supports cross-functionality at the team level and reduces the coordination overhead required between teams.
Second, when dependencies cannot be avoided, they must be madetransparent and actively managed. The Nexus framework encourages early identification of dependencies during Nexus Sprint Planning so that teams can coordinate their work effectively. However, the goal remains to continuously reduce dependencies over time through better backlog ordering, architecture improvements, and skill broadening.
Third,integration of work is vital and takes precedence over completing all planned work. In Scrum Nexus, an Increment is only considered "Done" when the work of all teams is fully integrated and meets the shared Definition of Done. Unintegrated work, even if technically complete by an individual team, does not provide value and increases risk.
Fourth, integration must occurearly and often during the Sprint, not only at the end. Continuous integration helps uncover issues sooner, supports frequent inspection, and enables timely adaptation. Delaying integration increases the likelihood of defects, rework, and failure to produce a usable Increment.
NEW QUESTION # 15
How does the Cone of Uncertainty influence the work being done by a development team during a product's development lifetime?
Answer:
Explanation:
TheCone of Uncertaintydescribes how the level of uncertainty in a product's requirements, technology, and value is highest at the beginning of a product's lifetime and gradually decreases as knowledge is gained. This concept strongly influences the type of work a development team performs throughout the product's development lifecycle and aligns well with Scrum's empirical approach.
Early Stage: High Uncertainty and Discovery Work
At the start of a product's development lifetime, manyunknownsexist. These may relate to customer needs, technical feasibility, usability, or business value. According to Scrum's empirical nature, teams should not assume certainty where it does not exist. Therefore, early development work focuses primarily ondiscovery.
During this stage, the Development Team works to reduce uncertainty by:
* Conducting research and experiments,
* Building prototypes or spikes,
* Testing assumptions with users,
* Validating technical and business hypotheses.
This type of work helps the team learn quickly and avoid premature commitment to detailed solutions. The goal is not maximizing feature output, butmaximizing learningand reducing risk.
Middle Stage: Reduced Uncertainty and Feature Development
As important unknowns are discovered and addressed, the Cone of Uncertainty narrows. The team gains confidence in what to build and how to build it. At this point, work increasingly shifts toward delivering functional stories and featuresthat provide direct value to users.
Development during this phase focuses on:
* Building usable, integrated product increments,
* Expanding functionality based on validated learning,
* Refining features through feedback and inspection.
Scrum supports this transition by enabling frequent inspection and adaptation through Sprints, ensuring that learning continues while value delivery accelerates.
Late Stage: Low Uncertainty and Operational Work
Toward the end of a product's development lifetime, most significant uncertainties have been resolved.
According toEvidence-Based Management (EBM),Unrealized Value becomes low, whileCurrent Value is high. At this stage, the volume of new feature development typically decreases.
The team's work becomes moreoperationalin nature, such as:
* Maintenance and optimization,
* Improving performance or stability,
* Addressing technical debt,
* Supporting existing users.
Investment decisions increasingly focus on sustaining value rather than discovering new opportunities.
NEW QUESTION # 16
A fellow Scrum Master asks for your input. His team members see no value in defining a Sprint goal and he has trouble explaining its use to them. What would you tell this Scrum Master?
Answer:
Explanation:
If team members see no value in defining a Sprint Goal, this indicates a fundamental misunderstanding of Scrum. As a Scrum Master, I would explain to my fellow Scrum Master that theSprint Goal is a core element of Scrumand is essential for alignment, commitment, and empiricism.
First, the Sprint Goal explainswhy the Scrum Team is doing the work in the Sprint. According to the Scrum Guide, the Sprint Goal is the single objective for the Sprint and provides coherence to the Sprint Backlog. Without a clear "why," Sprint work becomes a collection of unrelated tasks rather than a purposeful effort to deliver value. The Sprint Goal helps the team understand the intent behind the selected Product Backlog Items and aligns daily decisions with that intent.
Second, the Sprint Goal represents acommitment by the Scrum Team. The team commits to doing everything in its power to achieve the Sprint Goal, even though the specific scope may evolve. This commitment fosters focus and shared accountability. Instead of optimizing for individual tasks, the team optimizes for achieving the Sprint Goal as a whole.
Third, the Sprint Goal actuallycreates flexibility rather than restricting it. When new discoveries, risks, or opportunities emerge during the Sprint, the team can adapt the Sprint Backlog as long as those changes do not endanger the Sprint Goal. This allows the team to respond to change while maintaining stability of purpose.
Without a Sprint Goal, change becomes arbitrary and increases the risk of losing focus.
Fourth, the Sprint Goal enables effectiveinspection and adaptation. During the Daily Scrum, the team inspects progress toward the Sprint Goal and adapts their plan accordingly. Similarly, at the Sprint Review, stakeholders can inspect whether the Sprint Goal was met. Without a Sprint Goal, there is no meaningful benchmark for inspection.
Finally, it is important to be clear thatwithout a Sprint Goal, Scrum is not being practiced as intended.
The Sprint Goal is a required element of Scrum, and removing it undermines transparency and weakens the empirical foundation of the framework.
NEW QUESTION # 17
How can leadership of an agile organization help self-organizing teams get the most out of Scrum?
Answer:
Explanation:
Leadership plays a critical role in enabling self-organizing teams to succeed with Scrum. While Scrum Teams are self-managing, organizational leadership must create the conditions in which Scrum can thrive. This support is expressed through behaviors that reinforce empiricism, accountability, and continuous improvement, rather than through command-and-control practices.
First, leadership can help by actively supporting self-organization and Scrum adoption. This includes trusting teams to decide how they do their work, resisting the urge to micromanage, and reinforcing Scrum practices and values across the organization. Leaders who understand and support Scrum help protect teams from external pressure that undermines self-management.
Second, leaders should learn about Agile and Scrum and understand how to interact with Scrum Teams effectively. This knowledge enables leadership to engage in ways that are helpful rather than disruptive-for example, collaborating through Scrum events instead of bypassing the Product Owner or directly assigning work to Developers. Informed interaction strengthens alignment while preserving team autonomy.
Third, leadership must respect Scrum accountabilities, especially the authority of the Product Owner.
Respecting Product Owner decisions on ordering the Product Backlog ensures clear accountability for maximizing value. When leadership overrides or bypasses the Product Owner, it undermines transparency, focus, and trust within the Scrum Team.
Fourth, leadership can significantly support teams by removing impediments that are beyond the team's control. These may include organizational policies, structural constraints, tooling limitations, or conflicting incentives. By actively addressing such impediments, leadership enables teams to improve their effectiveness and deliver value more consistently.
Finally, leadership should provide a clear organizational vision and strategy. A compelling vision and coherent strategy give Scrum Teams a sense of purpose and direction, helping them understand how their work contributes to broader organizational goals. This clarity supports better decision-making, alignment, and motivation at the team level without prescribing detailed solutions.
NEW QUESTION # 18
A Scrum Master is working with a Development Team that has members in different physical locations.
Development Team meets in a variety of meeting rooms and has much to do logistically (for example, setup conference calls) before the Daily Scrum. What action should be Scrum Master take?
Answer:
Explanation:
When a Development Team is distributed across different physical locations and faces logistical overhead just to start theDaily Scrum, this situation represents animpediment to effective inspection and adaptation. As a Scrum Master, the appropriate action is toenable the team to inspect and adapt more effectively, not to control or manage logistics on their behalf.
1. Help the Team Establish a Stable and Simple Daily Scrum Setup
The Scrum Master should work with the Development Team toinspect and improve how the Daily Scrum is conducted. This may include:
* Agreeing on afixed time and virtual location,
* Standardizing tools (e.g., always the same conferencing solution),
* Reducing setup effort so the event can start on time and remain within its 15-minute timebox.
This supports transparency and reduces unnecessary waste.
2. Remove or Reduce Organizational and Technical Impediments
If logistical difficulties stem from organizational constraints-such as lack of proper tooling, inadequate rooms, or unreliable communication infrastructure-the Scrum Master shouldaddress these as impediments.
This may involve working with IT or management to provide stable tools that enable smooth collaboration.
3. Coach the Team Toward Self-Management
Rather than running the Daily Scrum or handling logistics personally, the Scrum Master shouldcoach the Developers to self-managehow they organize the event. The goal is for the team to own and continuously improve the Daily Scrum in a way that fits their distributed context.
NEW QUESTION # 19
Mid-sprint a development team forecasts it will not be able to deliver all the planned backlog items. They are worried andask for your advice as Scrum Master. What will you tell them?
Answer:
Explanation:
When a Development Team realizes mid-Sprint that it may not be able to deliver all planned Sprint Backlog Items, this situation should be handled throughempiricism, not concern or blame. As a Scrum Master, I would reassure the team and guide them back to Scrum principles.
First, I would remind the team that in Scrum they donot commit to delivering all Sprint Backlog Items.
Instead, the Scrum Team commits todoing their very best to achieve the Sprint Goal. Discovering additional work, complexity, or unknowns during the Sprint is expected, especially in complex product development. The Sprint Backlog is a forecast, not a fixed contract.
Second, I would help the team assess theimpact of what they have discovered. If the newly discovered work is minor and theSprint Goal is still within reach, the team can continue as planned while adapting the Sprint Backlog as needed. This reflects normal inspection and adaptation during the Sprint.
Third, if the impact is significant and threatens the Sprint Goal, the Development Team should have a focused discussion aboutif and how the Sprint Goal can still be met. This may involve changing the approach, reducing scope while preserving the Sprint Goal, or identifying alternative ways to deliver the intended value.
In such cases, theProduct Owner should be involvedin the conversation. Including the Product Owner increases transparency and enables faster value-based decision-making, such as re-negotiating scope or adjusting priorities while keeping the Sprint Goal intact. This collaboration ensures that adaptations are aligned with product value.
NEW QUESTION # 20
What is meant by a team or organization practicing 'zombie' or 'mechanical' Scrum?
Answer:
Explanation:
Practicing'zombie' or 'mechanical' Scrumrefers to an approach where teams and organizations follow the rules and events of Scrum in a superficial manner, merely going through the motions, without embracing the underlying purpose, values, and principles of the framework.
In mechanical Scrum, teams conduct the required events, maintain the prescribed artifacts, and use Scrum terminology, but do sowithout focusing on value, learning, or outcomes. Scrum events become routine meetings rather than opportunities for inspection and adaptation. The Sprint Goal may exist on paper, but it does not meaningfully guide decisions. As a result, Scrum is reduced to a checklist of practices rather than a framework for solving complex problems.
This approach contrasts sharply with practicing"Real" Scrum, which isvalue-driven and goal-oriented.
Real Scrum emphasizes delivering meaningful outcomes for customers and stakeholders, rather than simply completing tasks. Teams focus on achieving the Sprint Goal, maximizing product value, and understanding the impact of their work.
Furthermore, mechanical Scrum often ignores theScrum Values. WithoutCourage, teams avoid difficult conversations; withoutOpenness, problems are hidden; withoutRespect, collaboration suffers; without Commitment and Focus, teams optimize for activity rather than outcomes. This leads to stagnation and missed opportunities for improvement.
In contrast, Real Scrum recognizes that Scrum is aframework, not a rigid methodology. It intentionally leaves room for teams and organizations to discover and adopt additional practices that support empiricism, continuous improvement, and stakeholder satisfaction. These practices are chosen to reinforce Scrum's core values, not to replace them.
NEW QUESTION # 21
What is Scrum's relation to Empiricism / Empirical Process Control?
Answer:
Explanation:
Scrum is fundamentally based onEmpiricism, also referred to asEmpirical Process Control. This means that Scrum recognizes that complex work, such as software development, cannot be fully understood or predicted upfront. Instead, decisions are made based onexperience, observation, and evidence, forming a continuous closed feedback loop.
Empirical Process Control rests on three pillars:Transparency, Inspection, and Adaptation. Scrum provides a structured framework of roles, events, and artifacts that explicitly support and reinforce each of these pillars.
Transparency
Transparency ensures that all significant aspects of the process and product are visible to those responsible for the outcome. In Scrum, transparency is created through clearly defined artifacts such as theProduct Backlog, Sprint Backlog, and Product Increment, each governed by a shared Definition of Done. Scrum Events further enhance transparency by creating regular opportunities to share progress, challenges, and current state.
Without transparency, inspection would be misleading and ineffective.
Inspection
Scrum prescribes frequent and regularinspectionof both the product and the process. Each Scrum Event serves as an inspection point:
* TheDaily Scruminspects progress toward the Sprint Goal,
* TheSprint Reviewinspects the Increment and adapts the Product Backlog,
* TheSprint Retrospectiveinspects the team's ways of working.
These inspections are intentionally timeboxed and lightweight to avoid excessive overhead while still enabling timely feedback.
Adaptation
Inspection is meaningful only if it leads toadaptation. Scrum explicitly enables adaptation by allowing changes to plans, processes, and backlog content based on what is learned. The Sprint Backlog may be adapted during the Sprint, the Product Backlog is adapted after the Sprint Review, and team practices are adapted following the Sprint Retrospective.
Closed Feedback Loop
Together, transparency, inspection, and adaptation form aclosed feedback loop. Scrum's short iterations (Sprints) ensure that learning occurs frequently, enabling the Scrum Team and stakeholders to respond quickly to change, reduce risk, and improve outcomes over time.
NEW QUESTION # 22
In what way does Scrum encourage ethical behaviour, doing "the right thing", in software development?
Answer:
Explanation:
Scrum encourages ethical behaviour in software development by creating a framework that promotes transparency, accountability, quality, and respect for stakeholders, all of which are grounded in the Scrum Values. Rather than prescribing ethical rules, Scrum embeds ethical behaviour into the way work is organized and delivered.
First, Scrum promotes ethics through its focus ondelivering valuable, high-quality working products. The Scrum Guide emphasizes delivering usable Increments that meet a shared Definition of Done. By prioritizing quality and value for both the organization and end-users, Scrum discourages practices such as cutting corners, hiding technical debt, or delivering misleading progress, which are ethically questionable.
Second, Scrum strongly supportstransparency, a core pillar of empiricism. All significant aspects of the work-such as progress, impediments, risks, and uncertainties-are made visible through artifacts and events.
This transparency encourages honesty about what can and cannot be achieved and prevents unethical behaviour such as misreporting status or concealing problems until it is too late.
Third, Scrum encouragesaccountabilityat both individual and team levels. Clear accountabilities for the Product Owner, Developers, and Scrum Master ensure that responsibility is not diffused or avoided. Teams are accountable for delivering value, improving their way of working, and meeting their commitments. This accountability fosters ethical decision-making and ownership of outcomes.
Fourth, Scrum supports ethical behaviour throughcontinuous learning and improvement. Sprint Retrospectives create a structured opportunity to reflect on mistakes, share knowledge, and improve processes and practices. This openness to learning promotes humility, integrity, and a willingness to correct issues rather than ignoring or rationalizing them.
Finally, Scrum is explicitly guided by theScrum Values of Commitment, Courage, Focus, Respect, and Openness, which form its ethical foundation.
* Commitmentencourages teams to do what they say they will do.
* Courageenables individuals to raise concerns, admit problems, and challenge unethical practices.
* Focushelps teams concentrate on delivering real value rather than superficial outputs.
* Respectensures consideration for colleagues, stakeholders, and end-users.
* Opennesspromotes honesty about progress, challenges, and uncertainty.
NEW QUESTION # 23
Decisions to optimise value and control risk are made based on the perceived state of the artefacts. What events and practises can improve transparency over the artefacts? Explain why.
Answer:
Explanation:
In Scrum, decisions to optimize value and control risk depend on theperceived state of the artifacts. If artifacts are not transparent, inspection and adaptation become ineffective, leading to poor decisions. Scrum therefore defines specificevents and practicesto improve transparency and support empirical decision- making.
Scrum Events That Improve Artifact Transparency
Sprint Planningimproves transparency by aligning the Scrum Team on the current state of theProduct Backlogand theProduct Increment. The Product Owner explains backlog ordering and objectives, while Developers assess what is feasible based on the current Increment and Definition of Done. This shared understanding reduces risk by creating a realistic Sprint Goal.
Daily Scrumimproves transparency of theSprint Backlog. Developers inspect progress toward the Sprint Goal and make visible emerging risks, dependencies, and impediments. Daily inspection ensures that deviations are discovered early, enabling fast adaptation and reducing delivery risk.
Sprint Reviewimproves transparency of theProduct IncrementandProduct Backlog. Stakeholders directly inspect the Increment and provide feedback. This exposes assumptions, validates value, and informs Product Backlog adaptation, helping optimize future value and reduce market risk.
Sprint Retrospectiveimproves transparency ofprocess-related aspectsthat influence the artifacts. By inspecting ways of working, tools, skills, and the Definition of Done, the team identifies improvements that increase artifact quality and reliability over time.
Practices That Improve Transparency
Aclear and shared Definition of Doneensures transparency of the Product Increment. It creates a common understanding of what "complete" means and prevents hidden work or misleading progress.
Product Backlog refinementimproves transparency by clarifying Product Backlog Items, making assumptions explicit, and reducing uncertainty. Although not a formal Scrum event, refinement supports better inspection and forecasting.
Frequent integration and testingimprove transparency by making the real state of the Increment visible early and often. This reduces the risk of late surprises and unintegrated work.
Visible metrics and information radiators(such as Sprint Goals, Sprint Backlogs, and progress toward objectives) help stakeholders and teams understand the state of work without relying on reports or interpretations.
NEW QUESTION # 24
A Scrum Team has been working on a product for nine Sprints. A new Product Owner comes in, understanding he is accountable for the Product Backlog. However, he is unsure about his responsibilities.
Which two activities are part of the Product Owner role according to Scrum?
Answer:
Explanation:
According to Scrum, theProduct Owneris accountable formaximizing the value of the productand for effectiveProduct Backlog management. Two key activities that are explicitly part of this role are:
1. Ordering the Product Backlog to Maximize Value
The Product Owner is responsible forordering the Product Backlogso that the most valuable work is done first. This ordering reflects:
* Business and customer value,
* Risk and uncertainty,
* Strategic goals and learning from previous Sprints.
Through this activity, the Product Owner ensures that the Scrum Team is always working on what matters most.
2. Ensuring Product Backlog Items Are Transparent, Clear, and Understood The Product Owner ensures that Product Backlog Items are:
* Clearly expressed,
* Transparent to the Scrum Team and stakeholders,
* Understood well enough for Developers to select them during Sprint Planning.
This does not mean writing detailed requirements alone, butcollaboratingso that shared understanding exists.
NEW QUESTION # 25
......