
[Jul-2026] C_P2W43_2023 PDF Dumps Extremely Quick Way Of Preparation
Download C_P2W43_2023 Dumps (2026) - Free PDF Exam Demo
NEW QUESTION # 36
You need to create a new functional location. Which actions can you perform with the SAP Fiori app "Create Technical Object"? Note: There are 3 correct answers to this question
- A. Assign documents
- B. Create a task list for functional location
- C. Edit classification data and characteristics.
- D. Change a reference location.
- E. Assign a subordinate piece of equipment.
Answer: A,C,D
NEW QUESTION # 37
You want to create a maintenance order with an external order operation that includes service items.
How can you achieve this? Note: There are 2 correct answers to this question
- A. The assignment of a control key with key externally processed operation is sufficient.
- B. The usage of a model service specification is mandatory.
- C. The assignment of a control key with the service indicator set is mandatory
- D. The actual value entry can be recorded only via the service entry sheet
Answer: B,C
NEW QUESTION # 38
How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question
- A. By installing the corresponding enhancement pack and activating the related business function
- B. By manually activating the corresponding Business Feature in case Best Practices are not
- C. Phase-based maintenance is always active in all S/4HANA 2021 editions and above
- D. Through Best Practices scope items 4HH and 4HI.
Answer: C,D
NEW QUESTION # 39
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?
- A. SAP Predictive Analysis
- B. SAP Asset Strategy and Performance Management
- C. SAP S/4HANA Core Data Services
- D. SAP Lumira Designer
Answer: C
NEW QUESTION # 40
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question
- A. Work order confirmation
- B. Maintenance plan item
- C. Notification item
- D. Maintenance plan header
- E. Equipment task list
Answer: A,B,C
NEW QUESTION # 41
What do you have to consider when planning maintenance work that is to be carried out by an external company?
- A. In the control key assigned to the order operation, the "Service" indicator must always be activated.
- B. If you assign a control key with indicator "Service" for an external service, you have to enter the actual values via the service entry sheet.
- C. If you assign a control key for an external order operation, the actual values must always be entered as a goods receipt in the system.
- D. For the maintenance order type, you have to assign the Enhanced Procurement Mode.
Answer: A
NEW QUESTION # 42
Which requirements have to be fulfilled so that an Inspection Checklist with Inspection Lots is generated? Note: There are 2 correct answers to this question.
- A. An Inspection Plan and a technical object must be assigned to the same class.
- B. A PM task list with inspection point type must be assigned to the maintenance order
- C. An object list must have been generated manually or automatically.
- D. A checklist type must be assigned to the maintenance order header.
Answer: A,B
NEW QUESTION # 43
The maintenance engineer creates a strategy plan with the call object maintenance order. Shift factors are set to 100% which date is relevant for the calculation of future planned dates if the maintenance work is delayed?
- A. Actual finish date of the maintenance order
- B. Technical completion date of the maintenance order
- C. Planned date of the next call, independent of maintenance order dates
- D. The date of the final confirmation
Answer: B
NEW QUESTION # 44
How do you map a counter replacement in SAP S/4HANA Asset Management?
- A. Deactivate the current counter and create a new counter.
- B. Assign a catalogue type for counter replacement to the measuring point category.
- C. Create a new measurement document and assign a valuation code for counter replacement.
- D. Create a new measurement document marked as a counter replacement.
Answer: D
NEW QUESTION # 45
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note: There are 3 correct answers to this question?
- A. Analyze confirmed maintenance orders that have NOT been settled.
- B. Display approved purchase requisitions for which purchase orders have been generated.
- C. Display approved purchase requisitions for which NO purchase orders have been generated
- D. Analyze overdue maintenance orders that have NOT been finally confirmed
- E. Analyze maintenance orders that are still in planning and have NOT been released.
Answer: B,C,D
NEW QUESTION # 46
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?
- A. Via the SAP Fiori app "Manage Maintenance Order List"
- B. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
- C. Within the SAP Fion-based background job
- D. Via the SAP Fiori app "Maintenance Scheduling Board"
Answer: A,D
NEW QUESTION # 47
What happens if you change the primary key of a functional location?
- A. Changing the superior functional location via alternative labeling is not possible.
- B. The user must decide whether the functional location is assigned to a new superior functional location.
- C. The functional location cannot be assigned to a new superior functional location when the new label is entered.
- D. The user must define a new labelling system for the new primary key.
Answer: C
NEW QUESTION # 48
You want to display additional document information within the document flow of a maintenance order.
For which type of document must this be customized?
- A. Service entry sheet
- B. Invoice
- C. Goods movement
- D. Purchase order
Answer: C
NEW QUESTION # 49
Which functionalities belong to the current portfolio of SAP Business Objects Business Intelligence? Note: There are 2 correct answers to this question.
- A. Plant Maintenance Information Systems (PMIS)
- B. SAP Crystal Reports
- C. SAP Lumira
- D. SAP Quick Viewer
Answer: B,C
NEW QUESTION # 50
You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?
- A. Referenced notifications are put in Process again.
- B. Open purchase requisitions are recompiled
- C. Open purchase orders are recompiled.
- D. Open reservations are recompiled.
Answer: B,D
NEW QUESTION # 51
During the implementation project you need to define the organizational units relevant for Plant Maintenance. Which of the following objects can you directly assign to a maintenance plant? Note: There are 2 correct answers to this question
- A. Maintenance planner group
- B. Maintenance work center
- C. Storage location
- D. Organizational unit
Answer: B,C
NEW QUESTION # 52
Which default object type do you use to settle a refurbishment order?
- A. The material
- B. The cost center
- C. The WBS element
- D. The fixed asset
Answer: A
NEW QUESTION # 53
......
Enhance your career with C_P2W43_2023 PDF Dumps - True SAP Exam Questions: https://www.exam4labs.com/C_P2W43_2023-practice-torrent.html
New Download free C_P2W43_2023 PDF for SAP Practice Tests: https://drive.google.com/open?id=1Qgd6kNFoWaBk2uAz4ZBBEvJT4Vmzc679