[Aug 01, 2021] Updates Up to 365 days On Valid 1z0-1075-20 Braindumps [Q37-Q57]

Share

[Aug 01, 2021] Updates Up to 365 days On Valid 1z0-1075-20 Braindumps

Best Quality1z0-1075-20 Exam Questions  Oracle Test To Gain Brilliante Result

NEW QUESTION 37
The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

  • A. Complete using quantity completion
  • B. Change Move status to Ready.
  • C. Change status of Operation to completed
  • D. Complete with Details
  • E. Quick Complete

Answer: D,E

 

NEW QUESTION 38
The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

  • A. The Costing Interfaced Attribute is enabled in the resource definition.
  • B. The Manage Item Rules setup is not complete.
  • C. The item was made inactive after the Work Order transaction.
  • D. The Costing Interfaced Attribute is not enabled in the resource definition.

Answer: D

 

NEW QUESTION 39
A manufacturing plant works for two shifts of 8 hours each. The Manufacturing user wants a work center resource R1 of 4 units to be available during a nonworking time outside the regular shift on a particular day.
Identify the sequence of steps to create a resource exception in the Manage Work Center Resource Calendar page.

  • A. Click Outside the existing Shift time on a Specific Date> Create Work Center page> Click the Resource Availability tab> Click Add icon> Select R1 from Resource Drop-down list> Enter 4 in Default Units Availability column.
  • B. Click Inside the existing Shift time on a Specific Date>Create Work Center page>Click the Resource Availability tab>Click Add icon> Select R1 from Resource Drop-down list> Enter4 in Default Units Available.
  • C. Click Inside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability region> Populate 4 units in Default Availability column.
  • D. Click Outside the existing Shift time on a Specific Date> Action Menu> Select Create Resource exception> Populate Start and Duration Field> Resource Availability and Overrides Region> Populate
    4 units in Availability Override column.

Answer: D

 

NEW QUESTION 40
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.

  • A. Rescheduled Work Order WO-2045 duration = 1.25 days
  • B. Rescheduled Work Order WO-2045 duration = 3.25days
  • C. Rescheduled Work Order WO-2045 duration = 0.75 days
  • D. Rescheduled Work Order WO-2045 duration = 2 days

Answer: C

 

NEW QUESTION 41
A Work Center created a month ago is no longer in use now. You want to remove the Work Center; however, the system is no allowing you to delete it.
Identify three reasons for this.

  • A. The work center is being referenced in the Work Area.
  • B. The Work Center is being referenced in the Closed Work Order.
  • C. There are resources associated with the Work Center.
  • D. The work center is being references in the work definition operation.
  • E. The Work Center is being referenced in the Open Work Order.

Answer: A,C,E

 

NEW QUESTION 42
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.

  • A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
  • B. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
  • C. Set the global sourcing rule in GOP to determine supply creation option as Make.
  • D. Set a local sourcing rule in GOP to determine supply creation option as Make.
  • E. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.

Answer: A,C

 

NEW QUESTION 43
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

  • A. Update Supply Plan Options, Overwrite Firm Planned Orders = None.
  • B. Update Firm flag in the Details region of the Edit Work Order page.
  • C. Update Firm flag in the Details region of the Edit Work Definition page.
  • D. Update Firm flag in the Details region of the Edit Work Definition Names page.

Answer: A,B

 

NEW QUESTION 44
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?

  • A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
  • B. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
  • C. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
  • D. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK

Answer: B

 

NEW QUESTION 45
As part of an implementation project, you have to perform setups related to a Manufacturing plant in Functional Setup Manager.
What must be set up first in order for you to configure the setup task called Manage Plant Parameters?

  • A. The Manage Items Profile Options tasks
  • B. The Supply Chain Orchestration Functional Area
  • C. The Manufacturing Master Data Functional Area
  • D. The Manage product and Child Value Sets task

Answer: C

 

NEW QUESTION 46
Which entity should you use to configure the manufacturing plant in Functional Manager?

  • A. Organization
  • B. Plant
  • C. Legal Entity
  • D. Business Unit

Answer: B

 

NEW QUESTION 47
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse from scrap to ready.
  • B. Reverse the product at the last operation.
  • C. Reverse resources charged to a work order.
  • D. Reverse from reject to ready.
  • E. Reverse at an operation.
  • F. Reverse material issued to a work order.

Answer: A,C,D,F

 

NEW QUESTION 48
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.

  • A. Production Line
  • B. Manufacturing Lead Time
  • C. Resources
  • D. Operations
  • E. Operation Items

Answer: C,D,E

 

NEW QUESTION 49
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and the corresponding HTTP action available with Manufacturing Cloud.

  • A. Work Order Status GET method
  • B. Work Order Status POST method
  • C. Resource transaction POST method
  • D. Resource transaction GET method
  • E. Work Orders PATCH method
  • F. Work Orders GET method

Answer: A,C,E,F

 

NEW QUESTION 50
A Production operator in your company is required to report production activities, such as completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.

  • A. Material Transactions
  • B. Resource Transactions
  • C. Orderless Transactions
  • D. Operation Transactions
  • E. Movement request

Answer: C

 

NEW QUESTION 51
The Plant Manager informs you that they have bought several machines for their manufacturing plant ABC.
The plant has been set up with a separate cost element set ABC in Manufacturing Cloud. You are requested to configure these machines in such a way that those are costed to the work order for which operations are performed on these machines.
Identify the correct setup that you will advise to the Plant Manager.

  • A. Set up the machines as cost element type of "Overhead" by selecting Cost Element set ABC.
  • B. Set up the machines as cost element type of "Resource" by selecting Cost Element set ABC.
  • C. Set up the machines as cost element type of "Overhead" by selecting Cost Element set Common.
  • D. Set up the machines as cost element type of "Resource" by selecting Cost Element set Common.

Answer: D

 

NEW QUESTION 52
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • B. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
  • C. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
  • D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.

Answer: D

 

NEW QUESTION 53
Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

  • A. The Automatically Transact check box is deselected.
  • B. The Automatically Transact check box is selected.
  • C. The Count Point check is selected.
  • D. The Count Point check box is deselected.
  • E. There are no components attached to it.

Answer: A,D

 

NEW QUESTION 54
Identify two reports that provide work order cost-related information to the costing user.

  • A. Cost Accounting Dashboard
  • B. WIP Balance by Plant
  • C. Work order Operational Analysis
  • D. Purchase Variance Summary

Answer: A,C

 

NEW QUESTION 55
In a Manufacturing Cloud post production support environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.

  • A. The operations are missing sequence.
  • B. None of the operations include scheduled resources.
  • C. The scheduled resources are not part of the organization selected by the user.
  • D. The work order operations do not have operations start or completion date.

Answer: A,B

 

NEW QUESTION 56
In a manufacturing cloud implementation, production operators want to perform work order updates using Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.

  • A. Report Receipts
  • B. Report Material Transactions by Quantity and Serial Number
  • C. Report Cost Transactions
  • D. Report Resource Transactions
  • E. Report Component Returns

Answer: B,D

 

NEW QUESTION 57
......

Focus on 1z0-1075-20 All-in-One Exam Guide For Quick Preparation: https://www.exam4labs.com/1z0-1075-20-practice-torrent.html