NEW QUESTION # 44
What are some options for creating a production order?
Note: There are 2 correct answers to this question.
- A. By converting a purchase requisition
- B. By setting a Kanban container to full
- C. By partially converting a planned order
- D. By setting a Kanban container to empty
Answer: C,D
NEW QUESTION # 45
Which of the following would you recommend as SAP's strategic Sales and Operations planning tool?
- A. Advanced Planning
- B. Flexible Planning
- C. Integrated Business Planning
- D. Standard Sales and Operations Planning
Answer: C
NEW QUESTION # 46
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Order (pool) chart
- B. Work center capacities chart
- C. Orders (dispatched) chart
- D. Capacity requirements chart
Answer: B,D
NEW QUESTION # 47
Which SAP applications can be used for forecasting in Supply Chain Planning? Note: There are 2 correct answers to this question.
- A. Supply Chain Management (SCM)
- B. Capacity Requirements Planning (CRP)
- C. Material Requirements Planning (MRP)
- D. Integrated Business Planning (IBP)
Answer: A,D
NEW QUESTION # 48
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A. Planned order or material number
- B. Lot size or material cost
- C. Validity period or sales order
- D. Alphanumeric or quota arrangement
Answer: D
NEW QUESTION # 49
In the context of the capacity scheduling table, how do you define a pacemaker work center?
- A. By assigning it to the capacity scheduling table
- B. By assigning it to the bottleneck operation
- C. By assigning it to the production version
- D. By assigning it to the first operation of a routing
Answer: C
NEW QUESTION # 50
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. Planned orders (firmed)
- B. Production orders
- C. ATP quantities
- D. Planned orders (unfirmed)
Answer: A,B
NEW QUESTION # 51
Which of the following are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 2 correct answers to this question.
- A. Create an object selection variant for alerts according to the priority of ATP categories
- B. Assign the alert profile to the overall profile
- C. Assign the overall profile to the authorization profile
- D. Create an object selection variant for production-planning-related alerts
Answer: B,D
NEW QUESTION # 52
Which business processes are affected by settings in the order type dependent parameters? Note: There are 2 correct answers to this question.
- A. Select master data.
- B. Schedule production orders.
- C. Define integration with cost accounting.
- D. Check material availability.
Answer: A,C
NEW QUESTION # 53
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Change number
- B. Lot size
- C. Alternative item group
- D. Co-product
Answer: C,D
NEW QUESTION # 54
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Material stock is built up for a long period of time in production.
- B. Replenishment is only triggered when components are required.
- C. Replenishment is always triggered on a regular basis.
- D. Material is only kept available in small quantities in production.
Answer: B,D
NEW QUESTION # 55
Which information is required when you create a product master in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.
- A. Industry sector
- B. Base unit of measure
- C. Selection screen for views
- D. Product type
Answer: A,B
NEW QUESTION # 56
What could be the reason for different combinations of components in a multiple bill of material (BOM)? Note: There are 2 correct answers to this question.
- A. Lot size
- B. BOM component status
- C. Manufacturing date
- D. BOM header status
Answer: A,C
NEW QUESTION # 57
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
- A. Sequencing on multi-activity resources is automatically updated during planning.
- B. To create a slot, neighbouring operations are moved in both planning directions.
- C. An operation is scheduled as close as possible to the desired date.
- D. Operations on multi-resources are planned finitely in a sequence.
Answer: C
NEW QUESTION # 58
Which planning strategies can you use in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Planning mode > Bucket
- B. Scheduling control > Close gap
- C. Planning mode > Order priority
- D. Scheduling control > Find slot
Answer: A,D
NEW QUESTION # 59
You want to create a production order.
What methods can you use?
Note: There are 2 correct answers to this question.
- A. Convert a purchase requisition
- B. Create by order release
- C. Create in Kanban process
- D. Create without material
Answer: C,D
NEW QUESTION # 60
Which options do you have to post goods receipt for a process order?
Note: There are 2 correct answers to this question.
- A. You post the entire manufactured quantity to one batch if the product quality changes during production.
- B. You post the entire manufactured quantity to one batch if the product quality remains consistent during production.
- C. You post the entire manufactured quantity to multiple batches if the product quality changes during production.
- D. You post the entire manufactured quantity to multiple batches if the product quality remains consistent during production.
Answer: B,C
NEW QUESTION # 61
Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.
- A. Operation duration
- B. Total replenishment lead time
- C. Planned delivery time
- D. In-house production time
Answer: C,D
NEW QUESTION # 62
Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Opening period
- C. Setup time
- D. Float after production
Answer: C,D
NEW QUESTION # 63
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.
- A. Setup time
- B. Float before production
- C. Wait time
- D. Processing time
- E. Pick time
Answer: A,C,D
NEW QUESTION # 64
Which options do you have to plan both quantities capacities during line loading in repetitive manufacturing? Note: There are 2 correct answers to this question.
- A. Run MRP with automatic selection of production version.
- B. Assign planned orders manually in the planning table.
- C. Run PP/DS heuristics for repetitive manufacturing.
- D. Run MRP with quota arrangement.
Answer: C,D
NEW QUESTION # 65
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Intelligence
- B. SAP Signavio Process Governance
- C. SAP Signavio Process Insights
- D. SAP Signavio Process Manager
Answer: B,D
NEW QUESTION # 66
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the supplier to the central storage location
- B. To control the flow of material from the central storage location to the production storage location
- C. To control the flow of material from the production storage location to the central storage location
- D. To control the flow of material from the supplier to the production storage location
Answer: B
NEW QUESTION # 67
Your project team decides to use a maketoorder planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision? Note: There are 3 correct answers to this question.
- A. Net requirements calculation is carried out for every sales order individually.
- B. Sales orders have to be ATPconfirmed (availabletopromise) to be saved.
- C. Both the reduction of maketoorder stock requirements occur on delivery.
- D. Production orders are created with sales order reference.
- E. Storage location MRP areas are required for salesorderspecific stock.
Answer: A,B,D
NEW QUESTION # 68
......
SAP C_TS422_2504 Exam Syllabus Topics:
| Topic | Details |
|---|---|
| Topic 1 |
|
| Topic 2 |
|
| Topic 3 |
|
| Topic 4 |
|
| Topic 5 |
|
| Topic 6 |
|
| Topic 7 |
|
| Topic 8 |
|